March 4th
Marching forth… 🙂 It’s been a very productive few days. I’ve implemented a new jewelry design feature – successfully (meaning no burnt up metal in the process!). I’ve made my first pair of earrings! They’ve long been on the list – but I’ve resisted. I make everything – so I obtain a chunk or slab of stone material and I cut it and shape it and polish it. And making earrings means making 2 of the same – or very close to the same. But it turns out it wasn’t as hard as it seems. And I’m very happy with the results!
And… I took off a fabulous very red shawl from the loom! It’s absolutely gorgeous with a lovely drape. I’m so motivated to warp of the loom for the next project!
So the rain and the cold and the bathroom construction (long story) have only served to help me concentrate on getting some great things done and keep me in the groove for more!